Preis auf Anfrage
Standort des Anhängers:Uluirmak Sk.Ankara, Turkei 06800(Öffnet in einem neuen Tab)
Verkäuferinformation
Verkäufer-Informationen anzeigenAGATHOR OTOMOTIV MADENCILIK DIS TICARET LIMITED SIRKETI
Kontakt:Hakan Genis
Telefon:+90 532 356 82 73
Ankara, Turkei 06800
Allgemein
Jahr
2025
Hersteller
THOR TRAILER
Zustand
Neu
Beschreibung
45 m3 LPG TANK SEMITRAILER
Chassis : Half chassis made of 6252 Steel quality . Strong and Heavy Duty type.
Axles : 3 x Turkish Axles , German Tüv Approved with 14 tons capacity each.
Brakes : Drum Brakes
Suspension : Steel Suspension
Brake System : Two line brake system with WABCO ABS according to European Norms, Automatic Slack Adjusters
Landing Legs : 24 tons each according to the European Norms
Kingpin : 2 ‘’ changeable to 3,5 ‘’ according European Standards. King Pin Plate thickness 12 mm
Tyres : 12 + 1 385/R22.5 Bridgestone with Steel Rims
Electrical System : 24 V according to European Norms. ( ADR stop lights, 5 Lights on each side )
Complete Reflectors and Signs 3M Brand , Wheel chocks, 2 x Fire Extuinguisher ADR , 2 Units Food Box, Sunshade on the Tank
Accessoires : Water Tank , Spare wheel carrier
Project Code : AD2000 Code-PED97/23/EC
Design Temperature : Min -20 C / max. +50 C
Design Pressure : 17,16 bar
Test Pressure : 26,50 bar
Tank Material : P355 GH
Head Type : Elipsoidal
External Tank Diameter : 2.400 mm
Wall Thickness : 10 mm
Total Length of Tank : 13.200 mm
Equipments on Tank :
-2 inch Safety Relief Valve : REGO 7534G ( 2 Units )
-Rotogauge – Rotary Level Indicator ) : REGO ( 1 Unit )
-¾ inch excess Flow Valve for Manometer ( 1 Unit )
-Thermometer (-30/60 C ) : Pakkens ( 1 Unit)
-Manometer ( 0-25 bar ) : Pakkens ( 1 Unit )
-Hydraulic Operator ( 1 Unit )
-2 inch Hydraulic Valve ( 2 Units )
-3 inch Hydraulic Valve ( 1 Unit )
-2 inch Ball Valves : Batu ( 3 Units )
-2 inch Filler Flanges : M60x4 ( 3 Units )
-ACME Filler Cap : ( 3 Units )
-Filter : Batu ( 1 Unit )
-16 inch Manhole ( 1 Set )
-Earthing Bar : ( 1 Set )
Paintwork and Sandblasting :
-During painting works of the external tank surface , it will be cleaned properly from any burr, hollow ,oil and dirt.
-Following the cleaning works, sanding will be applied to obtain surface appearance of SA 2 ½ quality.
-Roughness Value of the Surface will be 50 – 70 Rz
-As First coat will be applied epoxy paint base with surface tolerance and dry film thickness of 180 micron
-As the second coat , arcylic polyurethane top layer with high resistance with a dry film thickness of 70 micron
-Final Coat color of the Tank will be white ( RAL 9010 )
-Total Paint Thickness will be 250 microns
Radiographic Tests :
-Welding Seams of the tank will be subject to radiographic control by 100 % longtidunal values .
-Radiographic images will comply with the EN 1435 standard.
-The Relevant staff will be certified according to EN473.
-Radiographic examinations will be made through high-sensitive , panoramic and linear X-Ray devices.
-These controls will be executed by certified staff
Penetration Test or Magnetic Particle Test :
-Nozzle _Body and Manhole – Body Welds will be controlled through penetration or magnetic particle test method by 100%
Hydro static Test :
-Following the construction , the tanks will be subject to hydro static test as per the design rules and standards.
-During hydrostatic Test , clean and fresh water will be Liquid which may react to the tank materials will be used for hydro static test.
-In case the water and ambient temperature is below 15 C, the hydrostatic test will be not performed
-The Hydro static test will be accompanied by the independent certification body TURK LYOD .
-Following the hydro static test, inside and all internal Pipes of the Tank will be dehydrated.
-Inside of the Gas will be purged with gaseous nitrogen.
Certification :
-The tank will hold a branding / ‘’ Inspection Report and Certificate’’ issued by an international independent auditcompany ( Turk Lyod ) according to the European directive.
-Quality Plan and F Module Certificate
-Inspection Report and Certificate
-Quality Plan
-Sheet Orientation , Material List, Material Certificates
-Material Orientation Plan
-Material List
-Sheet , pipe and flange certificates
-Certificates of the welding materials
-Welding Method Instructions ( WPS )
-Welding Method Tests ( PQR )
-Welder Certificates and Welding Plan
-Plain seaming of the Body Sheet ( WPS )
-Circumferential welds of the Body ( WPS )
-Nozzle – Body – Manhole Weldings ( WPS)
-Pipe – Pipe,Pipe-Flange Weldings ( WPS )
-PQR
-Welder certificates
-Welding plan
-Dished Heads Reports, Head Treatment Graph and Report
-Dished Heads control report
-Dished Heads magnetic test report
-Heat treatment graph and report
-Welding Test reports of the Construction
-Longitudinal welding seams
-Circumferential welding seams
-Non-destructive test reports
-Eye and measure control report
-Dye penetrate test reports
-Radiography reports
-Hydrostatic Test Report
-Name Plate , Fixture Certificates
-Carbon copy of name plate
-Carbon Copy of the 3 rd party embossed stamp
Baffles : -Tank will have three Units of Anti-Slosh baffles
Zubehör
Abteile
1
Kategoriespezifisch
Aufbau
stahl